Draw attention to promos + sales!

Search

Search

    This section doesn’t currently include any content. Add content to this section using the sidebar.

    This section doesn’t currently include any content. Add content to this section using the sidebar.

    View bestsellers 

    Pre-order our new design

    Bespoke timepieces

    This section doesn’t currently include any content. Add content to this section using the sidebar.

    Wangi Power Station

    Wangi Power Station came into operation on the 7th of November 1958 after ten years of construction, playing a major role in the history of NSW power generation.

    The 1000 odd workers who built Wangi Power Station, lived in a massive camp which surrounded the site for the entire period construction.

    For the first five years, Wangi Power Station was the largest power station in NSW, relieving the state from the drastic power shortages and blackouts during the late 1950s, and restoring power to NSW after the full state shut down in June 1964.

    The site consisted...Read More
    Wangi Power Station came into operation on the 7th of November 1958 after ten years of construction, playing a major role in the history of NSW power generation.

    The 1000 odd workers who built Wangi Power Station, lived in a massive camp which surrounded the site for the entire...Read More