Engineers Office

Provenance

Camera
NIKON D7000
Lens
24.0-70.0 mm f/2.8
Settings
24mm · f/8.0 · 1.3s · ISO 100
Paper
Ilford Galerie Smooth Cotton Rag 310 gsm

Brick walls run the length of a narrow corridor inside Wangi Power Station's engineers office. Suspended ceiling tiles sag overhead. Grime coats the concrete floor. Glass partitions divide the passage on the left.

Edition
Open edition

Open edition
Printed to order, no fixed quantity. Each print is hand-signed by the photographer.

Limited edition
A fixed number of prints exist. Once sold, the edition closes permanently. Each print is individually numbered and signed.

$100.00 AUD
Size
Type
Colour
Signed, numbered, with COA. Made to order in 10 to 20 business days (framed). Shipped in protective packaging with edition certificate, paper-stock reference and a printed care guide.
See certificate sample →

Shipping Free shipping over $250. Ships worldwide, rates calculated at checkout.

Returns Damaged in transit? We replace it. Full policy →

Ships within 10 business days · signed & numbered

In situ

Engineers Office at Wangi Power Station, a narrow corridor of brown brick narrows toward a dead end.Engineers Office at Wangi Power Station, a narrow corridor of brown brick narrows toward a dead end.Engineers Office at Wangi Power Station, a narrow corridor of brown brick narrows toward a dead end.Engineers Office at Wangi Power Station, a narrow corridor of brown brick narrows toward a dead end.Engineers Office at Wangi Power Station, a narrow corridor of brown brick narrows toward a dead end.
01 PROVENANCE

Print datasheet

Title
Engineers Office
Series
Wangi Power Station
Catalogue
WPS-029
Process
Giclée
Captured
27 November 2015
Camera
NIKON D7000
Lens
24.0-70.0 mm f/2.8
Aperture
f/8.0
Shutter
1.3s s
ISO
100
Focal length
24 mm
Paper
Ilford Galerie Smooth Cotton Rag 310 gsm
Paper size
290 × 200 mm
Location
Wangi Wangi, New South Wales, Australia
Recognised by
Highly Commended in Multimedia at the 2016 National Trust of Australia (NSW) Heritage Awards
02 LOCATION

Wangi Wangi, New South Wales, Australia

Map · Mapbox · OpenStreetMap

03 THE STORY

About this print

The engineer's office at Wangi Power Station is a small room in the administration block, with a single window looking south across the plant. In this photograph, late-afternoon sunlight comes in through the window at a steep angle, picking out the surfaces of a timber desk, a swivel chair, and a wall of framed certificates and engineering drawings. The light falls in long bands across the floor. Dust drifts visible in the beam. The room is otherwise unremarkable: institutional carpet, painted plasterboard walls, a built-in bookshelf opposite the desk that still holds a few technical reference volumes. The window has not been opened in years.

Each generation shift at Wangi was overseen by a duty engineer who worked from this office. The engineer was responsible for the operational decisions that the control room operators carried out. The chair in this photograph is theirs. The bookshelf, the certificates, the wall calendar all belong to the decades of engineers who held the post at Wangi between 1958 and 1986. After the plant closed, the office was emptied of personal effects but the furniture and reference materials were largely left in place. The light coming through the window in this photograph is the same light those engineers worked under, on hundreds of identical late afternoons.

04 FROM THE FIELD NOTES

A narrow corridor of brown brick narrows toward a dead end. Sunlight cuts through the aluminium-framed windows on the left, throwing sharp diagonal bands across the opposite wall. Grit and fine debris coat the concrete floor. Ceiling tiles sag between exposed rails. The air looks dry and still.

Brett Patman

Wangi Power Station

The series

Wangi Power Station

51 photographs

About a thousand men built Wangi Power Station, on the western shore of Lake Macquarie. They were Hunter Valley locals and post-war Italian migrants, many living in a tent city on the lakeshore through the build. By 1957 they'd put up the main building, 228 metres long and eleven storeys high in triple-brick over a riveted steel frame, with three 76-metre concrete chimneys behind it.

View all in this series →

05 SIZE GUIDE

Print sizes

The anatomy view shows what this finish is as a physical object: paper margin, mat band, frame depth, acrylic profile. The comparison strip shows how each size sits relative to the others at true scale. Click a size or a finish to update both.

Anatomy · true ratio
TypeSizeWidthHeight
08 BY POST · NO SPAM

Read the full story

Articles when they're published. The history behind a place. The day of a shoot. The work between prints. No marketing, no schedule.

You're subscribed.