Pump House Equipment and Panel
Provenance
- Camera
- NIKON D7000
- Lens
- 14.0-24.0 mm f/2.8
- Settings
- 21mm · f/8.0 · 4s · ISO 100
- Paper
- Ilford Galerie Smooth Cotton Rag 310 gsm
A bank of pressure gauges and regulators lines the control panel inside White Bay Power Station's pump house. Chains hang from overhead gantries. Peeling paint curls from cabinet doors along the far wall. Concrete dust covers the floor.
Open edition
Printed to order, no fixed quantity. Each print is hand-signed by the photographer.
Limited edition
A fixed number of prints exist. Once sold, the edition closes permanently. Each print is individually numbered and signed.
Shipping Free shipping over $250. Ships worldwide, rates calculated at checkout.
Returns Damaged in transit? We replace it. Full policy →
Ships within 10 business days · signed & numbered
In situ





Print datasheet
- Title
- Pump House Equipment and Panel
- Series
- White Bay Power Station
- Catalogue
- WBP-057
- Process
- Giclée
- Captured
- 13 November 2015
- Camera
- NIKON D7000
- Lens
- 14.0-24.0 mm f/2.8
- Aperture
- f/8.0
- Shutter
- 4s s
- ISO
- 100
- Focal length
- 21 mm
- Paper
- Ilford Galerie Smooth Cotton Rag 310 gsm
- Paper size
- 290 × 200 mm
- Location
- Rozelle, New South Wales, Australia
- Authenticity
- C2PA verified provenance →
- Recognised by
- Highly Commended in Multimedia at the 2016 National Trust of Australia (NSW) Heritage Awards
Rozelle, New South Wales, Australia
Map · Mapbox · OpenStreetMap
About this print
The rusted panel still holds its cracked gauges, their needles frozen in place, remnants of a time when this pump house pulsed with industry. Once essential to maintaining steam pressure and flow, the surrounding equipment now sits coated in dust and corrosion, its levers and valves untouched for decades.
Brett Patman
The series
White Bay Power Station
Bricklayers laid 3.7 million bricks at White Bay across three and a quarter years of Phase 1 construction, on Wanngal Country at the western edge of Rozelle. The New South Wales Government Railways ran the build through its own Construction Department. By 3 July 1913, boilers and alternators were running before the buildings that housed them were complete.
Print sizes
The anatomy view shows what this finish is as a physical object: paper margin, mat band, frame depth, acrylic profile. The comparison strip shows how each size sits relative to the others at true scale. Click a size or a finish to update both.
| Type | Size | Width | Height |
|---|