An open, roofless court within a workshop building. Concrete covers most of the ground. One patch of exposed soil supports a cluster of ferns. Brick or masonry walls enclose the space on at least two sides. Natural light falls from above into the court.
Edition
Open edition
Open edition Printed to order, no fixed quantity. Each print is hand-signed by the photographer.
Limited edition A fixed number of prints exist. Once sold, the edition closes permanently. Each print is individually numbered and signed.
$100.00 AUD
Size
Type
Colour
✓
Signed, numbered, with COA. Made to order in 5 to 10 business days (unframed). Shipped in protective packaging with edition certificate, paper-stock reference and a printed care guide.
A small unroofed court sits within the workshop building at Elrington Colliery, near Abernethy in the Hunter Valley of New South Wales. Concrete covers almost all of the ground inside the enclosure. Ferns have colonised the one patch of soil left open, growing without apparent encouragement in the gap between the paving and the wall. Light comes from above, through the open roof, the only source in a space enclosed on all sides by masonry. The workshop complex was part of the surface infrastructure BHP constructed at Elrington between 1925 and 1930. BHP Collieries Proprietary Limited, whose principal shareholders were the Broken Hill Proprietary Company and Hebburn Limited, developed the site specifically to supply coking coal to BHP's Newcastle steelworks. The ground lease was executed on 13 November 1925. Both concrete-lined shafts, each 18 feet in diameter, were sunk to the Main Greta Seam at 1,190 feet below the surface. Coal production commenced in 1930. The mine was designed to produce 3,000 tonnes per day. It never reached that figure. BHP had intended Elrington to pioneer modern extraction methods in the Hunter Valley coalfields, but a combination of factors, including the effects of the 1929 to 1930 lockout that shut all collieries on the South Maitland coalfield, kept output well below target throughout the mine's working life. Elrington Colliery closed in December 1962 with large reserves of coal still in the ground. BHP cited persistent operating losses. Approximately 90 men were affected by the closure. The workshops did not close with the mine. On 17 June 1964, BHP opened Elrington Engineering Pty Ltd on the former colliery workshop site, employing approximately 50 tradesmen. The operation continued under private ownership into the 1970s. This photograph, made in 2017, records the workshop court as it now stands: concrete, masonry, ferns, and open sky.
04·FROM THE FIELD NOTES
A small unroofed court within the workshop building at Elrington Colliery, near Abernethy in the Hunter Valley. Concrete covers almost everything at ground level; ferns have taken the one patch of soil left open. The workshop complex was built as part of BHP's surface infrastructure, completed between 1925 and 1930, to support a mine designed to deliver 3,000 tonnes of coal a day to BHP's Newcastle steelworks. The mine never reached that figure, and closed in December 1962. The workshops outlasted it.
Brett Patman
05·SIZE GUIDE
Printsizes.
The anatomy view shows what this finish is as a physical object: paper margin, mat band, frame depth, acrylic profile. The comparison strip shows how each size sits relative to the others at true scale. Click a size or a finish to update both.