Electrical Workshop Windows

Provenance

Camera
NIKON D810
Lens
14.0-24.0 mm f/2.8
Settings
14mm · f/5.6 · 1/100 · ISO 100
Paper
Ilford Galerie Smooth Cotton Rag 310 gsm

Windows in the former electrical workshop at Elrington Colliery, near Abernethy in the Hunter Valley. The workshop was part of the surface plant BHP Collieries had largely complete by 1927, three years before the first coal came up. Production ran until the mine closed in December 1962.

Edition
Open edition

Open edition
Printed to order, no fixed quantity. Each print is hand-signed by the photographer.

Limited edition
A fixed number of prints exist. Once sold, the edition closes permanently. Each print is individually numbered and signed.

$100.00 AUD
Size
Type
Colour
✓
Signed, numbered, with COA. Made to order in 5 to 10 business days (unframed). Shipped in protective packaging with edition certificate, paper-stock reference and a printed care guide.
See certificate sample →

Shipping Free shipping over $250. Ships worldwide, rates calculated at checkout.

Returns Damaged in transit? We replace it. Full policy →

Ships within 10 business days · signed & numbered

01 PROVENANCE

Print datasheet

Title
Electrical Workshop Windows
Series
Elrington Colliery
Catalogue
ECO-021
Process
Giclée
Captured
8 January 2017
Camera
NIKON D810
Lens
14.0-24.0 mm f/2.8
Aperture
f/5.6
Shutter
1/100 s
ISO
100
Focal length
14 mm
Paper
Ilford Galerie Smooth Cotton Rag 310 gsm
Paper size
297 × 210 mm
Location
Hunter Valley, New South Wales, Australia
Recognised by
Highly Commended in Multimedia at the 2016 National Trust of Australia (NSW) Heritage Awards
02 LOCATION

Hunter Valley, New South Wales, Australia

Map · Mapbox · OpenStreetMap

03 THE STORY

About this print

The electrical workshop at Elrington Colliery sits within the surface complex that BHP Collieries Proprietary Limited built during the late 1920s, near Abernethy in the Hunter Valley. Steel-framed windows run along the workshop wall, letting in a flat, even light across the concrete floor. Whatever equipment once occupied the space is long gone, but the structure itself holds: brick walls, exposed framing, the kind of room where close, careful work got done. The work here centred on the mine's battery locomotives, which ran on 3 ft 6 in gauge track underground, hauling coal from the face to the shaft bottom. Maintaining that equipment was its own discipline, separate from the general mechanical trades working elsewhere on the surface. The 1951 AEU stoppage that briefly shut collieries across the Hunter Valley began here, triggered when an electrical fitter at Elrington was suspended for refusing to do turning work. The union's position was straightforward: turning was the work of a fitter and turner, not an electrical fitter. The demarcation lines inside a place like this mattered. BHP Collieries Proprietary Limited sank two concrete-lined shafts, each 18 ft in diameter, to reach the Main Greta Seam at 1,190 ft below the surface. Coal production commenced in 1930. The mine had been designed to deliver 3,000 tonnes per day for BHP's Newcastle steelworks; it never got close to that figure. By December 1962, with large reserves of coal still unworked in the seam, BHP cited persistent operating losses and closed the mine. Approximately 90 men were affected. The surface complex did not stop with the colliery. BHP opened an engineering works at the former mine workshops on 17 June 1964, and the site has continued in industrial use since. This photograph, made in 2017, records the electrical workshop as it stood: emptied out, but still structurally intact, its windows doing the same job they always did.

04 FROM THE FIELD NOTES

The electrical workshop at Elrington Colliery, near Abernethy, was where the mine's battery locomotives were maintained between shifts underground. Those locomotives hauled coal on 3 ft 6 in gauge track through a seam sitting 1,190 ft below the surface. The workshop was part of the surface complex BHP Collieries Proprietary Limited built during the late 1920s. Coal production commenced in 1930; the mine closed in December 1962, with large reserves still in the ground.

Brett Patman

The series

Elrington Colliery

2017 · 66 photographs

Elrington Colliery sits in the South Maitland coalfields near Kearsley, south-east of Cessnock. BHP began sinking the first of its 2 shafts, specified to be lined with concrete, in January 1925, and struck coal 1,195 feet down in December 1927, in a mine meant to supply its Newcastle steelworks. The colliery worked the Main Greta Seam, and its underground railways used battery locomotives. The target was 3,000 tonnes a day. It was never reached. Ross Mainwaring's 2009 history calls the mine the Peter Pan Colliery, because it never grew up. In 1935 The BH Review, BHP's jubilee publication, said the company's John Darling and Elrington collieries were "hardly excelled in modern equipment and methods of working". The pit closed in December 1962. In 1964 its surface facilities were given a new lease of life as Elrington Engineering Pty Ltd, later Elrington Industries.

View all in this series →

05 SIZE GUIDE

Print sizes

The anatomy view shows what this finish is as a physical object: paper margin, mat band, frame depth, acrylic profile. The comparison strip shows how each size sits relative to the others at true scale. Click a size or a finish to update both.

Anatomy · true ratio
TypeSizeWidthHeight
08 BY POST · NO SPAM

Read the full story

Articles when they're published. The history behind a place. The day of a shoot. The work between prints. No marketing, no schedule.

You're subscribed.