Rear wall of a concrete and brick engine house, photographed at ground level. The wall surface shows weathering and staining across exposed masonry. The structure is single volume, no openings visible on the rear face. Natural light falls across the wall from one side, picking out surface texture.
Edition
Open edition
Open edition Printed to order, no fixed quantity. Each print is hand-signed by the photographer.
Limited edition A fixed number of prints exist. Once sold, the edition closes permanently. Each print is individually numbered and signed.
$100.00 AUD
Size
Type
Colour
✓
Signed, numbered, with COA. Made to order in 5 to 10 business days (unframed). Shipped in protective packaging with edition certificate, paper-stock reference and a printed care guide.
The rear wall of the main engine house at Elrington Colliery is concrete and brick, plain-faced, built to last. Behind it sat the winding machinery that worked the mine's two concrete-lined shafts, each 18 feet in diameter and sunk 363 metres through rock to reach the Main Greta Seam. BHP Collieries Proprietary Limited began developing the Elrington site in 1925, when shaft-sinking commenced. The company's intent was deliberate: a purpose-designed colliery that would apply modern extraction methods and deliver a planned output of 3,000 tonnes of coking coal per day, every tonne headed for the Newcastle steelworks less than 40 kilometres away. By the time coal production commenced in 1930, the surface infrastructure was largely in place. The two shafts, their concrete linings, the pit-top screens, the winding gear and the engine house were all part of a complex that BHP's own 1935 jubilee publication described as "hardly excelled in modern equipment and methods of working." The mine never came close to its target. Actual output through the 1950s ran between 250,000 and 340,000 tons per year, roughly half of what the design called for. The Great Depression stalled production early. A conservative workforce accustomed to hand-mining methods resisted the mechanisation BHP was pushing. Labour disputes interrupted operations at intervals across the mine's working life. The colliery earned the nickname "the Peter Pan Colliery" because, like Peter Pan, it never grew up. BHP closed Elrington in December 1962. Approximately 90 men were affected. Large reserves of coal remained unworked in the seam at the time of closure. The reason was economics, not exhaustion: persistent operating losses and the availability of alternative coal sources for the steelworks. The engine house wall recorded here in 2017 is one of the structures that remained after the main mining operations wound down. The shafts it once served are long silent, sunk through more than 100 storeys of rock to a seam that still holds coal.
04·FROM THE FIELD NOTES
The main engine house at Elrington Colliery stood above two concrete-lined shafts, each 18 feet in diameter, sunk 363 metres through rock to the Main Greta Seam. BHP Collieries built the site from 1925, intending it as a purpose-designed mine that would deliver 3,000 tonnes of coking coal a day to the Newcastle steelworks. The mine began producing coal in 1930 and never came close to that figure. It closed in December 1962 with large reserves still in the ground.