Main Engine House End
Provenance
- Camera
- NIKON D810
- Lens
- 14.0-24.0 mm f/2.8
- Settings
- 14mm · f/9.0 · 1/320 · ISO 100
- Paper
- Ilford Galerie Smooth Cotton Rag 310 gsm
The end of the main engine house at Elrington Colliery, near Abernethy, with the workshops behind it. Both buildings were part of the surface complex BHP Collieries built to supply coal to its Newcastle steelworks. The pit-top buildings were largely complete by 1927 and coal production commenced in 1930.
Open edition
Printed to order, no fixed quantity. Each print is hand-signed by the photographer.
Limited edition
A fixed number of prints exist. Once sold, the edition closes permanently. Each print is individually numbered and signed.
Shipping Free shipping over $250. Ships worldwide, rates calculated at checkout.
Returns Damaged in transit? We replace it. Full policy →
Ships within 10 business days · signed & numbered
Print datasheet
- Title
- Main Engine House End
- Series
- Elrington Colliery
- Catalogue
- ECO-033
- Process
- Giclée
- Captured
- 8 January 2017
- Camera
- NIKON D810
- Lens
- 14.0-24.0 mm f/2.8
- Aperture
- f/9.0
- Shutter
- 1/320 s
- ISO
- 100
- Focal length
- 14 mm
- Paper
- Ilford Galerie Smooth Cotton Rag 310 gsm
- Paper size
- 297 × 210 mm
- Location
- Hunter Valley, New South Wales, Australia
- Recognised by
- Highly Commended in Multimedia at the 2016 National Trust of Australia (NSW) Heritage Awards
Hunter Valley, New South Wales, Australia
Map · Mapbox · OpenStreetMap
About this print
The end wall of the main engine house at Elrington Colliery near Abernethy, with the workshop building visible behind it. BHP Collieries built the surface complex between 1925 and 1930 to support a mine that was planned to deliver 3,000 tonnes of coking coal a day to the Newcastle steelworks. The mine never reached that figure. It ran from 1930 until December 1962, when BHP cited persistent operating losses and closed it with large coal reserves still in the ground.
Brett Patman
The series
Elrington Colliery
Elrington Colliery sits in the South Maitland coalfields near Kearsley, south-east of Cessnock. BHP began sinking the first of its 2 shafts, specified to be lined with concrete, in January 1925, and struck coal 1,195 feet down in December 1927, in a mine meant to supply its Newcastle steelworks. The colliery worked the Main Greta Seam, and its underground railways used battery locomotives. The target was 3,000 tonnes a day. It was never reached. Ross Mainwaring's 2009 history calls the mine the Peter Pan Colliery, because it never grew up. In 1935 The BH Review, BHP's jubilee publication, said the company's John Darling and Elrington collieries were "hardly excelled in modern equipment and methods of working". The pit closed in December 1962. In 1964 its surface facilities were given a new lease of life as Elrington Engineering Pty Ltd, later Elrington Industries.
Print sizes
The anatomy view shows what this finish is as a physical object: paper margin, mat band, frame depth, acrylic profile. The comparison strip shows how each size sits relative to the others at true scale. Click a size or a finish to update both.
| Type | Size | Width | Height |
|---|