Main Engine House End

Provenance

Camera
NIKON D810
Lens
14.0-24.0 mm f/2.8
Settings
14mm · f/9.0 · 1/320 · ISO 100
Paper
Ilford Galerie Smooth Cotton Rag 310 gsm

The end of the main engine house at Elrington Colliery, near Abernethy, with the workshops behind it. Both buildings were part of the surface complex BHP Collieries built to supply coal to its Newcastle steelworks. The pit-top buildings were largely complete by 1927 and coal production commenced in 1930.

Edition
Open edition

Open edition
Printed to order, no fixed quantity. Each print is hand-signed by the photographer.

Limited edition
A fixed number of prints exist. Once sold, the edition closes permanently. Each print is individually numbered and signed.

$100.00 AUD
Size
Type
Colour
✓
Signed, numbered, with COA. Made to order in 5 to 10 business days (unframed). Shipped in protective packaging with edition certificate, paper-stock reference and a printed care guide.
See certificate sample →

Shipping Free shipping over $250. Ships worldwide, rates calculated at checkout.

Returns Damaged in transit? We replace it. Full policy →

Ships within 10 business days · signed & numbered

01 PROVENANCE

Print datasheet

Title
Main Engine House End
Series
Elrington Colliery
Catalogue
ECO-033
Process
Giclée
Captured
8 January 2017
Camera
NIKON D810
Lens
14.0-24.0 mm f/2.8
Aperture
f/9.0
Shutter
1/320 s
ISO
100
Focal length
14 mm
Paper
Ilford Galerie Smooth Cotton Rag 310 gsm
Paper size
297 × 210 mm
Location
Hunter Valley, New South Wales, Australia
Recognised by
Highly Commended in Multimedia at the 2016 National Trust of Australia (NSW) Heritage Awards
02 LOCATION

Hunter Valley, New South Wales, Australia

Map · Mapbox · OpenStreetMap

03 THE STORY

About this print

The end wall of the main engine house at Elrington Colliery stands at the eastern edge of the surface complex BHP Collieries built near Abernethy, in the Hunter Valley coalfields. The workshop building is visible in the background, separated by open ground. Together these two structures were the operational core of what BHP intended to be one of the most modern collieries in Australia. Shaft-sinking operations commenced in January 1925, with all machinery reported as installed by that date. The mine was formally established as Elrington Colliery in 1927, with the stated purpose of supplying coking coal to BHP's Newcastle steelworks. Surface infrastructure was largely complete by 1927. Coal production commenced in 1930 from two concrete-lined shafts, each 18 feet in diameter, sunk to the Main Greta Seam at 1,190 feet below the surface. BHP designed Elrington to produce 3,000 tonnes per day. Actual output during the 1950s ran at roughly 250,000 to 340,000 tonnes per year, consistently short of that target. The mine's failure to meet planned capacity became a documented case study in the limits of early mechanisation on the Hunter coalfields. In December 1962, BHP closed the colliery with large reserves of coal still in the ground, citing persistent operating losses. Approximately 90 men were affected. The workshops did not go idle. BHP opened an engineering business at the former colliery site on 17 June 1964, and the operation continued under private ownership into the following decades. This photograph, made in 2017, records the engine house end wall and workshops as they stood more than five decades after coal production ceased. The brick surfaces carry the weathering of that interval. The building line remains clear.

04 FROM THE FIELD NOTES

The end wall of the main engine house at Elrington Colliery near Abernethy, with the workshop building visible behind it. BHP Collieries built the surface complex between 1925 and 1930 to support a mine that was planned to deliver 3,000 tonnes of coking coal a day to the Newcastle steelworks. The mine never reached that figure. It ran from 1930 until December 1962, when BHP cited persistent operating losses and closed it with large coal reserves still in the ground.

Brett Patman

The series

Elrington Colliery

2017 · 66 photographs

Elrington Colliery sits in the South Maitland coalfields near Kearsley, south-east of Cessnock. BHP began sinking the first of its 2 shafts, specified to be lined with concrete, in January 1925, and struck coal 1,195 feet down in December 1927, in a mine meant to supply its Newcastle steelworks. The colliery worked the Main Greta Seam, and its underground railways used battery locomotives. The target was 3,000 tonnes a day. It was never reached. Ross Mainwaring's 2009 history calls the mine the Peter Pan Colliery, because it never grew up. In 1935 The BH Review, BHP's jubilee publication, said the company's John Darling and Elrington collieries were "hardly excelled in modern equipment and methods of working". The pit closed in December 1962. In 1964 its surface facilities were given a new lease of life as Elrington Engineering Pty Ltd, later Elrington Industries.

View all in this series →

05 SIZE GUIDE

Print sizes

The anatomy view shows what this finish is as a physical object: paper margin, mat band, frame depth, acrylic profile. The comparison strip shows how each size sits relative to the others at true scale. Click a size or a finish to update both.

Anatomy · true ratio
TypeSizeWidthHeight
08 BY POST · NO SPAM

Read the full story

Articles when they're published. The history behind a place. The day of a shoot. The work between prints. No marketing, no schedule.

You're subscribed.