Main Workshop Cross View

Provenance

Camera
NIKON D810
Lens
14.0-24.0 mm f/2.8
Settings
14mm · f/9.0 · 1/8 · ISO 100
Paper
Ilford Galerie Smooth Cotton Rag 310 gsm

Looking across the middle of the main workshop at Elrington Colliery, near Abernethy, towards the blacksmith work area. The 15 tonne overhead crane spans the space. The workshop was also used to unload heavy goods and machinery, the crane doing the lifting. Coal production ran from 1930 until December 1962.

Edition
Open edition

Open edition
Printed to order, no fixed quantity. Each print is hand-signed by the photographer.

Limited edition
A fixed number of prints exist. Once sold, the edition closes permanently. Each print is individually numbered and signed.

$100.00 AUD
Size
Type
Colour
✓
Signed, numbered, with COA. Made to order in 5 to 10 business days (unframed). Shipped in protective packaging with edition certificate, paper-stock reference and a printed care guide.
See certificate sample →

Shipping Free shipping over $250. Ships worldwide, rates calculated at checkout.

Returns Damaged in transit? We replace it. Full policy →

Ships within 10 business days · signed & numbered

01 PROVENANCE

Print datasheet

Title
Main Workshop Cross View
Series
Elrington Colliery
Catalogue
ECO-036
Process
Giclée
Captured
8 January 2017
Camera
NIKON D810
Lens
14.0-24.0 mm f/2.8
Aperture
f/9.0
Shutter
1/8 s
ISO
100
Focal length
14 mm
Paper
Ilford Galerie Smooth Cotton Rag 310 gsm
Paper size
297 × 210 mm
Location
Hunter Valley, New South Wales, Australia
Recognised by
Highly Commended in Multimedia at the 2016 National Trust of Australia (NSW) Heritage Awards
02 LOCATION

Hunter Valley, New South Wales, Australia

Map · Mapbox · OpenStreetMap

03 THE STORY

About this print

The main workshop at Elrington Colliery near Abernethy was where the machinery of a coal mine was kept alive. A 15-tonne overhead electric crane spans the workshop, mounted on rails running the length of the ceiling, capable of lifting the kind of ironwork that would stop a mine dead if it failed underground. Standard-gauge rail is set directly into the floor, allowing coal wagons to be wheeled inside for repair rather than manhandled across an open yard. The blacksmith's work area occupies the far end of the space, where metalwork was shaped and repaired for the colliery's equipment needs. BHP Collieries Proprietary Limited, with principal shareholders the Broken Hill Pty Company and Hebburn Limited, began developing the Elrington site from 1925. The company sank two concrete-lined shafts, each 18 feet in diameter, to the Main Greta Seam at 1,190 feet below the surface. Coal production commenced in 1930. The mine was designed to supply hard bituminous coking coal to BHP's Newcastle steelworks and was intended to demonstrate modern extraction methods on the Hunter coalfields. BHP had set a target of 3,000 tonnes per day. The mine never reached it. Production ran at roughly half the planned rate through the 1950s, and in December 1962 BHP closed the colliery with large reserves of coal still unworked in the seam, citing persistent operating losses. Approximately 90 men were affected by the closure. The workshops themselves did not stand idle. On 17 June 1964, Elrington Engineering Pty Ltd opened on the former colliery grounds, employing around 50 tradesmen on mining equipment and general industrial orders. The site has remained in industrial use since. This photograph, made in 2017, records the workshop as it stood: crane overhead, rail in the floor, the blacksmith's corner still visible across the space.

04 FROM THE FIELD NOTES

The main workshop at Elrington Colliery near Abernethy was built to keep a mine running. A 15-tonne overhead electric crane handled the heavy lifts, and standard-gauge rail ran straight through the floor so coal wagons could be wheeled inside for repair rather than moved across the yard. BHP Collieries began developing the site in 1925, with coal production starting in 1930. The mine closed in December 1962, but the workshops did not sit idle for long. Elrington Engineering Pty Ltd opened on the same grounds on 17 June 1964, employing around 50 tradesmen, and the site has remained in industrial use since.

Brett Patman

The series

Elrington Colliery

2017 · 66 photographs

Elrington Colliery sits in the South Maitland coalfields near Kearsley, south-east of Cessnock. BHP began sinking the first of its 2 shafts, specified to be lined with concrete, in January 1925, and struck coal 1,195 feet down in December 1927, in a mine meant to supply its Newcastle steelworks. The colliery worked the Main Greta Seam, and its underground railways used battery locomotives. The target was 3,000 tonnes a day. It was never reached. Ross Mainwaring's 2009 history calls the mine the Peter Pan Colliery, because it never grew up. In 1935 The BH Review, BHP's jubilee publication, said the company's John Darling and Elrington collieries were "hardly excelled in modern equipment and methods of working". The pit closed in December 1962. In 1964 its surface facilities were given a new lease of life as Elrington Engineering Pty Ltd, later Elrington Industries.

View all in this series →

05 SIZE GUIDE

Print sizes

The anatomy view shows what this finish is as a physical object: paper margin, mat band, frame depth, acrylic profile. The comparison strip shows how each size sits relative to the others at true scale. Click a size or a finish to update both.

Anatomy · true ratio
TypeSizeWidthHeight
08 BY POST · NO SPAM

Read the full story

Articles when they're published. The history behind a place. The day of a shoot. The work between prints. No marketing, no schedule.

You're subscribed.