Tyres

Provenance

Camera
NIKON D810
Lens
14.0-24.0 mm f/2.8
Settings
14mm · f/9.0 · 1/2 · ISO 100
Paper
Ilford Galerie Smooth Cotton Rag 310 gsm

A pile of tyres heaped on the floor of the main engine house at Elrington Colliery, near Abernethy in the Hunter Valley. BHP Collieries worked the colliery from 1930 until December 1962, when it closed citing persistent operating losses. An engineering works opened in the former colliery workshops in June 1964.

Edition
Open edition

Open edition
Printed to order, no fixed quantity. Each print is hand-signed by the photographer.

Limited edition
A fixed number of prints exist. Once sold, the edition closes permanently. Each print is individually numbered and signed.

$100.00 AUD
Size
Type
Colour
✓
Signed, numbered, with COA. Made to order in 5 to 10 business days (unframed). Shipped in protective packaging with edition certificate, paper-stock reference and a printed care guide.
See certificate sample →

Shipping Free shipping over $250. Ships worldwide, rates calculated at checkout.

Returns Damaged in transit? We replace it. Full policy →

Ships within 10 business days · signed & numbered

01 PROVENANCE

Print datasheet

Title
Tyres
Series
Elrington Colliery
Catalogue
ECO-054
Process
Giclée
Captured
8 January 2017
Camera
NIKON D810
Lens
14.0-24.0 mm f/2.8
Aperture
f/9.0
Shutter
1/2 s
ISO
100
Focal length
14 mm
Paper
Ilford Galerie Smooth Cotton Rag 310 gsm
Paper size
297 × 210 mm
Location
Hunter Valley, New South Wales, Australia
Recognised by
Highly Commended in Multimedia at the 2016 National Trust of Australia (NSW) Heritage Awards
02 LOCATION

Hunter Valley, New South Wales, Australia

Map · Mapbox · OpenStreetMap

03 THE STORY

About this print

The main engine house at Elrington Colliery near Abernethy was built to hold the winding machinery that drove the mine's two concrete-lined shafts. Each shaft measured 18 feet in diameter and dropped 1,190 feet through rock to reach the Main Greta Seam. In 2017, what remained on the floor of that building was a pile of tyres. BHP Collieries Proprietary Limited developed the site from the mid-1920s as a dedicated supply mine for the company's Newcastle steelworks. The intention was to pioneer modern extraction methods on the Hunter coalfields and deliver 3,000 tonnes of coal a day. Coal production commenced in 1930 using battery locomotive haulage underground and a surface rail connection to the broader South Maitland Railway network. The mine never came close to its planned output, running at roughly half capacity through much of its working life. By December 1962, BHP closed Elrington Colliery. Approximately 90 men were affected. The company cited persistent operating losses; the seam itself was far from exhausted, with large reserves left untouched underground. The railway branch serving the colliery was dismantled in 1963. The site did not stay idle for long. On 17 June 1964, BHP opened Elrington Engineering Pty Ltd in the former colliery workshops. The business employed approximately 50 tradesmen and continued operating into the 1970s before passing into private hands. This photograph records the engine house as it stood in 2017. The winding machinery is long gone. The building remains, its floor occupied by a loose pile of tyres. The two shafts that justified the building's existence are somewhere below.

04 FROM THE FIELD NOTES

Inside the main engine house at Elrington Colliery near Abernethy, a pile of tyres sits on the floor where winding machinery once drove coal up two concrete-lined shafts to the surface. BHP built the colliery to supply its Newcastle steelworks, targeting 3,000 tonnes of coal a day. The mine never reached that figure. Production ran from 1930 until December 1962, when BHP shut the colliery with large reserves still in the ground, citing persistent operating losses. By June 1964, an engineering works had opened in the same buildings.

Brett Patman

The series

Elrington Colliery

2017 · 66 photographs

Elrington Colliery sits in the South Maitland coalfields near Kearsley, south-east of Cessnock. BHP began sinking the first of its 2 shafts, specified to be lined with concrete, in January 1925, and struck coal 1,195 feet down in December 1927, in a mine meant to supply its Newcastle steelworks. The colliery worked the Main Greta Seam, and its underground railways used battery locomotives. The target was 3,000 tonnes a day. It was never reached. Ross Mainwaring's 2009 history calls the mine the Peter Pan Colliery, because it never grew up. In 1935 The BH Review, BHP's jubilee publication, said the company's John Darling and Elrington collieries were "hardly excelled in modern equipment and methods of working". The pit closed in December 1962. In 1964 its surface facilities were given a new lease of life as Elrington Engineering Pty Ltd, later Elrington Industries.

View all in this series →

05 SIZE GUIDE

Print sizes

The anatomy view shows what this finish is as a physical object: paper margin, mat band, frame depth, acrylic profile. The comparison strip shows how each size sits relative to the others at true scale. Click a size or a finish to update both.

Anatomy · true ratio
TypeSizeWidthHeight
08 BY POST · NO SPAM

Read the full story

Articles when they're published. The history behind a place. The day of a shoot. The work between prints. No marketing, no schedule.

You're subscribed.