Workshop Across the Field

Provenance

Camera
NIKON D810
Lens
14.0-24.0 mm f/2.8
Settings
15mm · f/8.0 · 1/1250 · ISO 100
Paper
Ilford Galerie Smooth Cotton Rag 310 gsm

A wide workshop building viewed across an open yard. The gantry crane structure projects above the roofline. Corrugated metal cladding runs the length of the building. The blacksmith shop stands at the near side of the frame. Weathered paint and aged structural steel visible throughout.

Edition
Open edition

Open edition
Printed to order, no fixed quantity. Each print is hand-signed by the photographer.

Limited edition
A fixed number of prints exist. Once sold, the edition closes permanently. Each print is individually numbered and signed.

$100.00 AUD
Size
Type
Colour
Signed, numbered, with COA. Made to order in 5 to 10 business days (unframed). Shipped in protective packaging with edition certificate, paper-stock reference and a printed care guide.
See certificate sample →

Shipping Free shipping over $250. Ships worldwide, rates calculated at checkout.

Returns Damaged in transit? We replace it. Full policy →

Ships within 10 business days · signed & numbered

01 PROVENANCE

Print datasheet

Title
Workshop Across the Field
Series
Elrington Colliery
Process
Giclée
Captured
8 January 2017
Camera
NIKON D810
Lens
14.0-24.0 mm f/2.8
Aperture
f/8.0
Shutter
1/1250 s
ISO
100
Focal length
15 mm
Paper
Ilford Galerie Smooth Cotton Rag 310 gsm
Location
Hunter Valley, New South Wales, Australia
Recognised by
Highly Commended in Multimedia at the 2016 National Trust of Australia (NSW) Heritage Awards
02 LOCATION

Hunter Valley, New South Wales, Australia

Map · Mapbox · OpenStreetMap

03 THE STORY

About this print

The gantry crane frame above the roofline of the main workshop at Elrington Colliery tells you something about the scale of what BHP built here. The structure served a 15-tonne overhead electric crane inside, the kind of capacity needed to handle heavy mining equipment, replacement parts, and the ongoing maintenance demands of a colliery that BHP designed, from the outset, to be technically advanced. BHP Collieries Proprietary Limited, with principal shareholders Broken Hill Pty. Company Ltd. and Hebburn Limited, developed this site near Abernethy in the Hunter Valley to supply coking coal directly to the Newcastle steelworks. The railway branch reached the site in January 1924. Shaft-sinking commenced in January 1925, the two concrete-lined shafts each 18 feet in diameter, sinking 1,190 feet through rock to reach the Main Greta Seam. Coal production began in 1930. BHP set a target output of 3,000 tonnes per day. The mine never reached it. By 1950, actual output ran at roughly 1,500 tonnes per day, consistently well below what the surface infrastructure had been built to handle. The mine became known, eventually, as the Peter Pan Colliery. Like Peter Pan, it never grew up. The workshop building in this frame was part of that surface infrastructure. When the mine closed in December 1962, with large reserves of coal still in the seam, the workshops did not simply go idle. BHP opened Elrington Engineering Pty. Ltd. on the site on 17 June 1964, employing around 50 tradesmen serving mining equipment and general industrial work. The firm later became Elrington Industries, which still occupies the former colliery grounds. This photograph, made in 2017, records the main workshop as it stands now: the gantry frame still above the roofline, the blacksmith shop at the yard's edge, the building holding its shape against more than 50 years of weather since the last coal came up the shaft.

04 FROM THE FIELD NOTES

The main workshop at Elrington Colliery sits behind the blacksmith shop, its gantry crane frame still standing above the roofline. That crane served a 15-tonne overhead electric unit inside the building. BHP Collieries Proprietary Limited built this mine to supply coking coal to the Newcastle steelworks, sinking two concrete-lined shafts to 1,190 feet before coal production began in 1930. The mine closed in December 1962, with large reserves of coal left untouched in the seam.

Brett Patman

05 SIZE GUIDE

Print sizes

The anatomy view shows what this finish is as a physical object: paper margin, mat band, frame depth, acrylic profile. The comparison strip shows how each size sits relative to the others at true scale. Click a size or a finish to update both.

Anatomy · true ratio
TypeSizeWidthHeight
08 BY POST · NO SPAM

Read the full story

Articles when they're published. The history behind a place. The day of a shoot. The work between prints. No marketing, no schedule.

You're subscribed.